Another access briefRoofing accessWetherby, West Yorkshire
Roofing Scaffold and Rubbish Chute in Wetherby.
A continuous scaffold along a Wetherby terrace provided roofing platforms and an enclosed rubbish chute leading to the skip below.
Plan your access
The project at a glance
- Property
- Row of residential properties
- Working area
- Roofline across the terrace
- Access provided
- Continuous platforms & rubbish chute
What needed to be reached
Roof work across several properties.
The roofing contractors needed working access across the full roofline of a row of properties. Tools, materials and waste removal were all part of the access brief.
The access provided
Roof-level access with a waste route.
Boarded platforms ran along the properties at eaves level. An enclosed chute connected the working platform to the skip below for removal of old roofing materials.
The arrangement accounted for entrances and surrounding communal areas while following the length of the terrace.
The property
shaped the access.
- The continuous roofline across the terrace.
- Entrances and communal areas below.
- The route from the working platform to the skip.
Your property. Your access requirements.
Have a project
in mind?
Tell us the postcode, planned work and when you need access. Sky High quotes you directly and coordinates erection and dismantling through independent scaffolding subcontractors.
01423 601204